gsheen
Well-known member
Wow Mate Um that is insane, My shop has a 100Sqm and we have some heavy duty equipment including, a 3 phase vacuum that runs all day, a 3phase pressure washer, a Huge compressor also 3 phase that runs all day 2x 200 litre 3 phase water heaters for our parts wash bay and then their are the parts dryers. That coupled with a testing room that runs all day aswell and our bill is half that.
Tell those lady's to drink soup
and leave the heater off
Tell those lady's to drink soup

